Types of Floats in a Construction Project

video-placeholder
Loading...
查看授课大纲

您将学习的技能

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

审阅

4.8(1,844 个评分)

  • 5 stars
    79.93%
  • 4 stars
    17.35%
  • 3 stars
    2.16%
  • 2 stars
    0.32%
  • 1 star
    0.21%

GV

Sep 9, 2020

It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.

T

Apr 10, 2022

Excellent course with details. The Instructors are well equiped and has a lot of experience on the Industry. The only problem that i see is they didn't share the reading materials and ppt.

从本节课中

Activity Floats

Professor Odeh introduces the types of floats in a construction project including; total float, free float, interfering float and independent float.

教学方

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

探索我们的目录

免费加入并获得个性化推荐、更新和优惠。